____ is the traditional method of project delivery that moves sequentially from conception of a project through its construction.

A. Design-Build
B. Design-Bid-Build
C. Bid-Build
D. Design-Bid


Answer: B

Trades & Technology

You might also like to view...

A loose-laid ballasted roof is generally used with

A) a modified bitumen membrane. B) a built-up roof membrane. C) a single-ply membrane. D) all of the above.

Trades & Technology

Determine the final ratio of the following: Drive gear has 17 teeth; driven gear has 24 teeth.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Describe and give an example of how datum features can be specified individually.

What will be an ideal response?

Trades & Technology

Which instruction causes the program to jump to another point in the program?

A. Branching B. Looping C. Register D. Call

Trades & Technology