Using effort-driven scheduling, calculate the following. If you have 36 hours of work and 3 employees, the duration would be ________ hours
A) 6 B) 12 C) 9 D) 108
B
You might also like to view...
The text shown at the bottom of the screen shot above is the ____ where the selected instance is located in the document.
A. source area B. stage C. path D. library
Victor is working on a worksheet and realizes that he has entered incorrect information in a column. He selects the entire column and clicks the Delete button in the Cells group on the Home tab. Which of the following happens when Victor clicks the button?
A. ?The entire column will be deleted. B. ?The first cell of the selection will be deleted. C. ?The data in the first cell will be cleared. D. ?The data in the entire column will be cleared.
A picture ________ is a prebuilt set of formatting borders, effects, and layouts applied to a picture
Fill in the blank(s) with correct word
______ information is error free.
A. Accurate B. Useful C. Verifiable D. Organized