The three factors in good preparation for a physical inventory are:

I. housekeeping.
II. identification.
III. verification.
IV. training.

A) II, III and IV only B) I, III and IV only C) I, II and IV only D) I, II and III only


C

Trades & Technology

You might also like to view...

____ for light frame construction are made of cast-in-place reinforced concrete.

A. Foundations B. Plumb lines C. Footings D. Crawl spaces

Trades & Technology

Along with the technical tools and equipment needed in a shop you must also have which of the following to be able to function in todays market?

a. shop equipment b. communication system c. repair stalls d. all of the above e. none of the above

Trades & Technology

Technician A says that a disc brake caliper hardware kit and caliper overhaul kit are actually the same parts. Technician B says that a phenolic caliper piston caliper assembly cannot be overhauled. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician

Trades & Technology

Supervision of the construction work is the responsibility of:

A. the architect/engineer. B. the contractor. C. the Inspector. D. the owner. E. the Construction Management Firm