The James MacGregor Mining Company owns three mines: I, II, and III. Three grades of ore, A, B, and C, are mined at these mines. For each grade of ore, the number of tons per week available from each mine and the number of tons per week required to fill orders are given in the following table.
?
 
 
 
 
 
 
I
II
III
 RequiredTons/Week
Ore
Grades
A
B
C
10
0
10
10
10
  0
10
10
10
90
50
60
Cost/day
$6,000
$8,600
$12,400
 
?
?
Find the number of days that the company should operate each mine so that orders are filled at minimum cost. Find the minimum cost.
?
?

A. Minimum cost is $54,000 obtained by operating mine I for 2 days, mine II for 2 days, and mine III for 2 days.
B. Minimum cost is $93,400 obtained by operating mine I for 3 days, mine II for 3 days, and mine III for 4 days.
C. Minimum cost is $83,600 obtained by operating mine I for 2 days, mine II for 4 days, and mine III for 3 days.
D. Minimum cost is $74,600 obtained by operating mine I for 4 days, mine II for 3 days, and mine III for 2 days.
E. Minimum cost is $78,400 obtained by operating mine I for 4 days, mine II for 2 days, and mine III for 3 days.


Answer: D

Mathematics

You might also like to view...

Graph the parabola or ellipse. Include the directrix that corresponds to the focus at the origin.r = 

A.

B.

C.

D.

Mathematics

Solve the problem.Pete has 275 hot dogs and 325 hot dog buns. He wants to put the same number of hot dogs and hot dog buns on each tray. What is the greatest number of trays Pete can use to accomplish this?

A. 55 B. 25 C. 143 D. 5

Mathematics

Use the product rule to multiply. ? 

A. 5
B. 2
C.
D. 35

Mathematics

Translate the phrase to an algebraic expression. Use n for the variable unless otherwise stated.u divided into negative thirteen

A. u ÷ (-u) B. -13 - u C. u ÷ (-13) D. -13 ÷ u

Mathematics