Productivity is defined as the _____.

a. total amount of material a crew places for a given job
b. amount of material an individual worker places to complete a job
c. amount of material scheduled to be used in a given time
d. total amount of material an individual or crew places in a given time


d. total amount of material an individual or crew places in a given time

Trades & Technology

You might also like to view...

In order to receive an ASE master technicians shoulder patch, a technician must pass 6 of the 8 automotive ASE tests.

Answer the following statement true (T) or false (F)

Trades & Technology

Early engines were called flat head designs because they ________

A) Were only inline engines B) Used spark plugs at the top of the cylinders C) Did not include valves D) Used valves beside the cylinder

Trades & Technology

To test high-voltage systems you need a ____ digital volt ohmmeter.

A. Category 1 B. Category 2 C. Category 3 D. Category 4

Trades & Technology

Which development led to the widespread use of the mechanized pumping apparatus?

a. private insurance companies b. jacketed hose c. wagon mounted steam engines d. internal combustion engines

Trades & Technology