When installing a split-system small commercial refrigeration system, the condensing unit normally contains:

A) Enough refrigerant for just the condensing unit alone.
B) Enough refrigerant for the entire system, including a set length of lines.
C) No refrigerant, just a nitrogen holding charge.
D) Enough refrigerant for both the condensing unit and the evaporator, but not the refrigerant lines.


C

Trades & Technology

You might also like to view...

What should be taken into account when performing a heat gain or heat loss calculation?

What will be an ideal response?

Trades & Technology

Explain political risk and how it affects engineering and construction contracts

What will be an ideal response?

Trades & Technology

Electrical circuit schedules can be used to provide electrical panel, circuits, poles, and amperage requirements and specifications. An electrical panel schedule can be used to provide panel size and type, main circuit size and type, panel manufacturer and model, and wiring specifications.

Answer the following statement true (T) or false (F)

Trades & Technology

In an isometric sketch, an isometric cube shows four sides.

Answer the following statement true (T) or false (F)

Trades & Technology