Who benefits from non-excusable delays and why?

What will be an ideal response?


Non-excusable delays are attributable to the actions, or inactions, of contractors. When contractors cause delays to the completion of projects, such delays prevent contractors from obtaining time extensions for delays and the contractor might have to pay damages to owners.

Trades & Technology

You might also like to view...

Point and edge ____ is done by selecting vertices on the part in the orthogonal views and then locating those vertices on the pictorial by moving along the edges of the part.

A. tracking B. moving C. finding D. anchoring

Trades & Technology

What is the value of angle A in decimal degrees to 2 decimal places that corresponds to tan A = 1.25678?

A. 141.49o B. 51.49o C. 89.02o D. 38.51o

Trades & Technology

Which of the following is not a metal treatment method?

A. Sintering B. Annealing C. Peening D. Tempering

Trades & Technology

ALU is

A) the arithmetic logic unit. B) all logic units. C) the additional logic unit. D) the arithmetic latch unit.

Trades & Technology