The design of a ceiling in a large office building calls for a multilevel series of ceiling planes finished with gypsum board. The most likely method for attaching the ceiling to the structure is to
A) nail gypsum board directly to the wood light-frame structure.
B) use lay-in acoustical tile.
C) screw the gypsum board directly to a suspended metal framework.
C) screw the gypsum board directly to a suspended metal framework.
You might also like to view...
What are the benefi ts of rapid prototyping?
What will be an ideal response?
Why would you use Friiss's formula?
A. To provide the overall noise effect of a multistage system. B. To break down any periodic waveform into a series of sine and/or cosine waves at multiples of the fundamental frequency. C. To establish that different users can share bands of frequencies provided that each user was assigned exclusive use of a frequency range within that band. D. To show how the construction of a square wave can be seen to be made up of a number of sinusoids.
The most effective method of checking the heating elements of an electric furnace during operation is:
A) Measuring the temperature of each heat strip. B) A visual inspection. C) Checking the resistance of each heat strip. D) Checking the amp draw of each heat strip.
What is the difference between a quantity measurement and a rate measurement?
What will be an ideal response?