When installing an exposed grid ceiling system, the first component to be installed is the _____

a. main runners
b. hanger inserts and wires
c. cross runners (tees)
d. wall angle


d

Trades & Technology

You might also like to view...

Describe the weld(s) required to join A4 to A1 and A2.

Review drawing number 523838C0A and then answer the question.

Trades & Technology

A DMM set to read DC volts is connected across terminals 6 and 14 of the DLC. The meter reads zero volts at all times, key on or key off. This indicates ________

A) Bad UART output B) Headlights are OFF C) A CAN BUS shorted to ground D) A low temperature condition

Trades & Technology

Air trapped within a replacement hydraulic unit requires the use of ________ to bleed out the air

A) A dead blow hammer
B) A vacuum pump
C) A pedal depressor
D) A scan tool

Trades & Technology

Any object must have at least ____________________ view(s) to be complete.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology