When formated as a date, the results of EDATE(Start_Date,3 ) if the contents of Start_Date is 10/30/2018 would be ________
A) 1/31/2019 B) 10/31/2018 C) 1/30/2019 D) 11/2/2018
C
You might also like to view...
What is wrong with the following code?
int f1( int x, int y) { x = y * y; return x; int f2( float a, float& b) { if(a < b) b = a; else a=b; return 0.0; } } a. Neither function should return a value b. Function definitions may not be nested c. Both parameters to f2 should be pass-by reference d. in f2, a can not be assigned b. e. nothing is wrong
What command is appended to ip nat to enable Port Address Translation?
A) pat B) extended C) overload D) None of the above
A JavaScript program that checks which type of browser is running is commonly called a browser checker.
Answer the following statement true (T) or false (F)
Math.pow(4, 1.0 / 2) returns __________.
a. 2 b. 2.0 c. 0 d. 1.0 e. 1