The ____ of a roof is a way of indicating how steep the roof is.
A. rise
B. pitch
C. span
D. overhang
Answer: B
You might also like to view...
The U.S. National Institute of Standards and Technology defines the incident response life cycle as having four main processes: 1) preparation; 2) detection and analysis; 3) containment, eradication, and recovery; and 4) ____.
A. incident report B. triage C. post-incident activity D. resolution
Joe the technician cannot work on Tuesday. Therefore, which of the following is TRUE?
A. Joe’s target hours must be removed from the capacity calculations for Tuesday B. If Tuesday is a busy day with a packed schedule, the shop will have over capacity C. Both A and B are correct D. Neither A nor B are correct
In which of the following output devices would you be more likely to find a piezo actuator?
A. linear proportioning solenoid B. electrohydraulic injector (EHI) C. non-contact TPS D. stepper motor
What is the inductive reactance of an inductor that drops 12 VRMS and carries 50 mARMS?
A) 600 ? B) 240 ? C) 6 ? D) 60 ?