List the order of importance of OSHA inspections from highest to lowest.____________________________________________________________________________________________________________________________________________________________________________________

What will be an ideal response?


Imminent danger
Catastrophes and fatal accidents
Employee complaints
Programmed high-hazard situations
Follow-up inspections

Trades & Technology

You might also like to view...

What are the three things that should come to mind wherever a straightness tolerance with the MMC modifier is associated with a feature of size dimension?

What will be an ideal response?

Trades & Technology

What information can be found on the jacket of corrugated stainless steel tubing?

a. the maximum working pressure, the pipe size, and the tensile strength b. the pipe size, the tensile strength, and the testing standards and approval agencies c. the maximum working pressure, the pipe size, and the testing standards and approval agencies d. the maximum working pressure, the tensile strength, and the testing standards and approval agencies

Trades & Technology

The subsequent problems deal with the circuit below where:Vs=2 sin (100 t) V, R1=1k?, R2=1k?, and C=1µfAssume the circuit is operating in steady state (transients already gone).What is the polar form of the equivalent impedance (in ?) of the R1?C branch?

A. 1000 < 0°> B. 10050 <84.3°> C. 1005 <5.71°> D. 1005 E. 10050

Trades & Technology

The difference between backward scheduling and forward scheduling is which of the following?

A) Backward scheduling uses firm and planned orders; forward scheduling uses only planned orders. B) Backward scheduling begins from the start date; forward scheduling begins with the due date. C) Backward scheduling uses standard times; forward scheduling uses actual lead times. D) Backward scheduling begins from the due date; forward scheduling begins with the start date.

Trades & Technology