The Acme Class Ring Company designs and sells two types of rings: the VIP and the SST. They can produce up to 24 rings each day using up to 60 total man-hours of labor. It takes 3 man-hours to make one VIP ring, versus 2 man-hours to make one SST ring.How many of each type of ring should be made daily to maximize the company's profit, if the profit on a VIP ring is $60 and on an SST ring is $20?
A. 20 VIP and 4 SST
B. 24 VIP and 0 SST
C. 24 VIP and 4 SST
D. 20 VIP and 0 SST
Answer: D
You might also like to view...
Find all the polar coordinates of the point.(-1, 3?/2)
A. (1, ?/2 + 2n?), (-1, 3?/2 + 2n?) B. (1, ?/2 + 2n?), (-1, 5?/2 + 2n?) C. (1, ? + 2n?), (-1, 3?/2 + 2n?) D. (1, 3?/2 + 2n?), (-1, ?/2 + 2n?)
Calculate the instantaneous velocity for the given value of t of an object moving with rectilinear motion according to the given function relating s (in ft) and t (in s)s = t3 + t2 - 6t - 7; t = -3
A. -14 ft/s B. 14 ft/s C. 15 ft/s D. 21 ft/s
Solve the equation.-5q + 1.4 = -28.2 - 1.3q
A. 5.9 B. -33 C. 6.2 D. 8
A jet heads in the direction N 30° E at a speed of 400 mi/h. If the jet experiences a 20 mi/h crosswind flowing due east, find (a) the true velocity w of the jet. (b) the true speed of the jet. (c) the direction of the jet.
What will be an ideal response?