A control malfunction that results from a system heating or cooling past its setpoint is called:
A) Anticipation. B) Temperature swing.
C) Overshoot. D) Lag.
C
You might also like to view...
The show ring routine consists of walking, _____, and teaching how to move around the ring.
Fill in the blank(s) with the appropriate word(s).
Technician A says that for best results, loosen the fastener immediately after spraying it with penetrating oil. Technician B says that rusted fasteners may be loosened by tapping with a hammer. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B
What water temperatures do most hot water boilers heat up to?
What will be an ideal response?
A two-trip DTC will be stored in the PCM memory when a fault is detected during a subsequent second trip, and the MIL will begin flashing.
Answer the following statement true (T) or false (F)