Answer the following statements true (T) or false (F)

1. Establishing the project's economic feasibility and its overall budget is part of the design phase of the project.
2. The construction drawings of a building project are drawings that the architect uses to explain the design to the owner.
3. The project manual includes the project's construction drawings.
4. All required surety bonds must be provided by the GCs who are bidding for the project, along with their bids, that is, at the time of bidding.
5. Where the owner is sufficiently familiar and confident of the financial and contractual
capabilities of the GCs bidding for the project, the owner may not require the bid bond. This reduces the total cost of construction.


1. False
2. False
3. False
4. False
5. True

Trades & Technology

You might also like to view...

Energy is the ability to do ___________________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Dogs and cats cannot utilize facial expressions to express different emotional states

A. True B. False

Trades & Technology

Rapidly withdrawing a rotating boring bar immediately after the cut is completed, may:

A) Cause dulling or possible breaking of the cutting tool B) Cause an undesirable surface finish in the bore I. D. C) Leave helical tool marks in the work D) All of the above

Trades & Technology

How many BTUs are required to raise the temperature of 15 pounds of water from 100° F to 130°F?

A) 15 lbs × (130°F + 100°F) = 3450 BTUs B) 15 lbs × (130°F - 100°F) = 450 BTUs C) (130°F / 15 lbs) - (100°F / 15 lbs) = 2 BTUs D) The BTUs required cannot be determined using the information given.

Trades & Technology