A symbol in which a circle is below the reference line and tangent to it has the number 200 mm shown to the right of the circle. Directly below the circle is the number 6 in parentheses. The letters "SMAW" are shown in the tail. What does this symbol signify?

A. Spot welds 200 mm in diameter are to be placed on the arrow side of the object. There are to be 6 welds, each placed with the shielded metal arc welding process.
B. 6 spot welds are to be placed on the arrow side of the object 200 mm apart with the welds placed with the shielded metal arc welding process.
C. Seam welds are to be placed on the arrow side of the object, 200 mm apart with the welds penetrating a distance of 6 mm.
D. A weld all around with a thickness of 200 mm is to be placed with a penetration of 6 mm.
E. None of the above. This is an incorrect symbol.


Answer: B

Trades & Technology

You might also like to view...

An earthen dam breast for as low-head hydro system is a right triangular solid with a base 8 ft. wide and a height of 9 ft.  The breast is 14 ft. long.  The volume of the dam breast is:?

A. ?63 cu. ft. B. ?126 cu. ft. C. ?252 cu. ft. D. ?504 cu.ft.

Trades & Technology

What force is used to convert charging pressures into injection pressures in EUIs?

A. electronic from control cartridge B. electrical from injector drivers C. hydraulic from fuel sub-system D. mechanical from injector cam profile

Trades & Technology

The following is a list of vessels and structures that are associated with the heart. 1. right atrium 2. left atrium 3. right ventricle 4. left ventricle 5. vena cavae 6. aorta 7. pulmonary trunk 8. pulmonary veins What is the correct order for the flow of blood entering from the systemic circulation?

A) 1, 2, 7, 8, 3, 4, 6, 5 B) 1, 7, 3, 8, 2, 4, 6, 5 C) 5, 1, 3, 7, 8, 2, 4, 6 D) 5, 3, 1, 7, 8, 4, 2, 6 E) 5, 1, 3, 8, 7, 2, 4, 6

Trades & Technology

Name the construction feature that is placed under the soil below the stem wall and spans between stable supports, where the support can be stable soil or pilings, and the depth and reinforcing required are determined by the load to be supported and then specified on the foundation plan and in details referenced to the foundation plan:

What will be an ideal response?

Trades & Technology