Many suppliers take the responsibility of installing the precast units. Why might this be desirable?


What will be an ideal response?


It might be desirable to have the supplier install the units if they have personnel experienced in the particular type of installation.

Trades & Technology

You might also like to view...

The illustration above shows _____ weatherstripping



a) vinyl bulb
b) interlocking threshold
c) fixed bottom sweep
d) automatic door bottom

Trades & Technology

Which of the following is NOT part of the hazard warning lamp circuit?

A) Instrument panel B) Turn signal lamps C) Flasher unit D) Head lamps

Trades & Technology

____ are typically used to measure very small spaces between two parts, such as spark plug gaps.

a. Post gauges b. Ring gauges c. Feeler gauges d. Micrometers

Trades & Technology

What explains the rise of the Populist party in the 1890s? Were the Populists reflecting only farmers' discontent, or did they express a deeper and wider political disaffection with the shortcomings of the two-party system in addressing adequately serious economic problems in the country?

What will be an ideal response?

Trades & Technology