Double-line drawings may include use of the ____ welding symbols to indicate the kinds of welds required for assembling the components of the pipe layout.

A. standard
B. company
C. public
D. normalized


Answer: A

Trades & Technology

You might also like to view...

Explain why water temperature is so critical for fish production

What will be an ideal response?

Trades & Technology

Which American challenge do you think will most dominate the first half of the 21st century: economic prosperity and justice, the global and local environment, or the threat of international terrorism? What resources does American history provide for meeting what you consider to be the single greatest challenge?

What will be an ideal response?

Trades & Technology

The purpose of a canvas connecter in a duct system is to reduce the transmission of noise and vibration.

Answer the following statement true (T) or false (F)

Trades & Technology

Which type of system is required to be grounded?

a. Systems less than 50V supplied by grounded transformers b. Circuits for cranes that operate over combustible fibers in Class III locations c. AC systems over 1kV that supply mobile or portable equipment d. Circuits for electrolytic cells

Trades & Technology