Explain how differing site conditions may call for contract changes.
What will be an ideal response?
Site condition changes usually apply to differing subsurface conditions than are indicated by contract documents or are available from geotechnical reports. Occasionally, actual conditions will not appear as assumed by the designer and as indicated in the construction documents. For instance, many times in renovation projects the designer does not have all of the previous construction details and plans of the original project that existed prior to the redesign. Unknown, or latent, conditions can appear after the start of construction which can cause a change to the contract.
You might also like to view...
As slavery spread in the South
A. social differences within society narrowed. B. the great plantation owners worked less. C. gaps in the social structure widened. D. planters tried to imitate the ways of English country gentlemen. E. it also increased dramatically in New England.
Why is growing food gaining popularity in cities?
What will be an ideal response?
The primary means to avoid non-point source nitrogen and phosphorus pollution in agricultural watersheds is to avoid applications that bring the available supply of these nutrients in soils to amounts higher that can be used by crop plants
Indicate whether the statement is true or false
Cow-hocked is the term used to describe the hock when it has too much set or bend.
Answer the following statement true (T) or false (F)