What should the lift director do when a deviation from the plan is deemed necessary?
a. Continue with the operation, since the site supervisor already approved the plan.
b. Stop the lift and place it in a safe condition.
c. Penalize the lift planner.
d. Direct the operator to be extra careful and monitor the LMI.
b. Stop the lift and place it in a safe condition.
You might also like to view...
Which item is a computer input sensor?
A) Throttle position angle B) RPM C) Engine coolant temperature D) All of the above
How is MVAC certification established?
A) Through separate certification B) Through universal certification C) Through lack of certification D) Through any type of certification
Technician A says that a stretched (worn) timing chain can cause the engine to lack power at slow speeds. Technician B says that a clogged exhaust system can cause the engine to lack power at high speeds. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians D) Neither technician
Centrifugal chillers range in size from ____ tons.
A. 10 to 50 B. 10 to 80 C. 50 to 500 D. 100 to 10,000