What should the lift director do when a deviation from the plan is deemed necessary?

a. Continue with the operation, since the site supervisor already approved the plan.
b. Stop the lift and place it in a safe condition.
c. Penalize the lift planner.
d. Direct the operator to be extra careful and monitor the LMI.


b. Stop the lift and place it in a safe condition.

Trades & Technology

You might also like to view...

Which item is a computer input sensor?

A) Throttle position angle B) RPM C) Engine coolant temperature D) All of the above

Trades & Technology

How is MVAC certification established?

A) Through separate certification B) Through universal certification C) Through lack of certification D) Through any type of certification

Trades & Technology

Technician A says that a stretched (worn) timing chain can cause the engine to lack power at slow speeds. Technician B says that a clogged exhaust system can cause the engine to lack power at high speeds. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician

Trades & Technology

Centrifugal chillers range in size from ____ tons.

A. 10 to 50 B. 10 to 80 C. 50 to 500 D. 100 to 10,000

Trades & Technology