What is the benefit of talking to the operator or the last person to run the system/equipment before it faulted out?
What will be an ideal response?
They can often give the troubleshooter information about what happened just before
the fault situation. They can also give information about how the system/equipment has
been abnormal over a period of time prior to the fault. The operator may have seen the
problem before and can give valuable information about what was done previously to fix
the issue.
You might also like to view...
What should you do if you could not determine the cause of the crash and thus, are unable to take corrective actions?
What will be an ideal response?
El aislamiento de conductos NO debe comprimirse más de ___ % en las esquinas del conducto.
a. 100 b. 50 c. 25 d. 10
Can you design a birdhouse without analyzing it?
What will be an ideal response?
In structural drafting, the CAD technician makes extensive use of lines to show the outline of the object being drawn. Which line type does this describe?
A. Illustration lines B. Physical lines C. Entity lines D. Object lines