Information that cannot be provided clearly or completely on the drawing or in schedules is provided in construction:

A. drawings
B. specifications
C. notes
D. all of the above


Answer: C

Trades & Technology

You might also like to view...

Certain operations require a specific welding process, a particular type of electrode, or other information necessary to complete the weld.

Answer the following statement true (T) or false (F)

Trades & Technology

?Today's springs are designed with a __________ frequency beyond the normal operating range of the engine.

What will be an ideal response?

Trades & Technology

Research is being done to convert sunlight to electricity by the use of solar cells

Indicate whether the statement is true or false

Trades & Technology

How is ultrasound used in leak detection?

A) It causes the formation of bubbles near a leak. B) It makes exiting gases visible. C) It amplifies the sound of a leakage. D) It allows for a visual close-up of the system.

Trades & Technology