Which of the following is the primary material for piping?

a. Glass
b. Carbon steel
c. Plastic-lined material
d. Solid plastic


a. Incorrect. The most common piping material is carbon steel because it is appropriate for a wide range of temperatures and is relatively economical.
b. Correct. The most common piping material is carbon steel because it is appropriate for a wide range of temperatures and is relatively economical.
c. Incorrect. The most common piping material is carbon steel because it is appropriate for a wide range of temperatures and is relatively economical.
d. Incorrect. The most common piping material is carbon steel because it is appropriate for a wide range of temperatures and is relatively economical.

Trades & Technology

You might also like to view...

?Using the ______  method,the construction manager may act purely as an advisor, providing guidance and expertise throughout the design and construction of a project, and does not guarantee a budget or schedule.

A. Construction Management for Fee B. Design-Build C. Construction Management at Risk D. Integrated Design Process

Trades & Technology

For a three-phase system, the maximum voltage imbalance allowed is _____.

a. 2% b. 5% c. 10% d. 20

Trades & Technology

A ____________________ engine has two rows of cylinders 60 or 90 degrees apart.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Entry of any contaminant into the potable water system is called

A. backwater B. backflow C. siphonage D. back pressure

Trades & Technology