Why should contractors rather than owners provide project schedules?
What will be an ideal response?
Engineers normally prepare an outline that shows the expected sequence of work but contractors are responsible for developing project schedules because owners do not want the liability of providing the schedule since it would allow subcontractors to sue the owner whenever there is a delay on projects.
You might also like to view...
When a pintle type nozzle is found on a current diesel engine system, which of the following would correctly describe its function?
A. DPF dosing injector B. common rail fuel injector C. secondary injector D. pilot injector
The water make-up system takes its level measurement from the:
a. deaerator and steam generating drum b. economizer and deaerator c. mud drum d. superheated tubes
The high and low pass filters in a twin-T oscillator act as a
A) phase shift filter B) notch filter C) bandpass filter D) negative feedback path
Copy machines operate on the principle of static electricity.
Answer the following statement true (T) or false (F)