A building requires 10 drilled piers with a shaft diameter of 30 inches, a bell diameter of 54 inches, and a bell angle of 60 degrees. The height from the bottom of the bell to the top of the pier is 15 feet. Using a waste factor of 15 percent, determine the number of cubic yards of concrete needed to pour the drilled piers.
What will be an ideal response?