An optimum jobsite layout plan maximizes on-site labor in material movement, travel, and transportation, allowing workers to spend the minimum amount of time performing construction activities.

Answer the following statement true (T) or false (F)


False

Trades & Technology

You might also like to view...

A stream is being considered for a low-head hydro system.  Its flow was measured at 5.1 cu. m/s.  What is the flow in gal./s?  (Round off to 2 decimal places.)?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

The study of plant life is called ____________________

Fill in the blank(s) with correct word

Trades & Technology

One adrenal hormone that affects glucose metabolism is

A) thymosin. B) cortisol. C) aldosterone. D) epinephrine. E) gonadotropin.

Trades & Technology

The implementation plan must consider and provide for: