To provide flexibility in a commercial building before the number of tenants is known, the parallel service-entrance conductors should terminate in a _____.

a. busway
b. branch circuit panelboard
c. grounded service conductor
d. main service disconnect


d. main service disconnect

Trades & Technology

You might also like to view...

When the power factor of the plant is 1.0 (unity), the kilovarmeter reads ____.

A. 0 B. 50 C. 100 D. infinity

Trades & Technology

The ____________________ has been the “working language” of electricians and electrical engineers for many years.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

The depth of a glulam beam (vertical dimension) is generally a multiple of a certain dimension. What is that dimension?

What will be an ideal response?

Trades & Technology

What is the minimum recommended velocity for a 2 5/8 inch suction riser in a low temperature system using R-22?

What will be an ideal response?

Trades & Technology