In a traditional construction contract ___________________________
A. the owner pays all the construction costs up front in order for construction to proceed
B. the architect works directly for the owner
C. the architect works with the general contractor to create the plans for construction
D. the owner acts as construction manager
B
You might also like to view...
A drill bit is tightened between the jaws of a chuck with a(n) ____________________.
Fill in the blank(s) with the appropriate word(s).
?Welding operators ____.
A. ?clean slag from the welds, and help position weldments B. ?operate machines or automatic equipment used to make welds C. ?often help the welder by making small welds to hold parts in place D. ?demonstrate good management skills by planning jobs and assigning workers
The tap conductor's ampacity shall not be less than the ____ on the circuits it supplies.
A. inverse of the total load B. combined calculated loads C. total capacity for the circuit breaker D. rating for the combined wires
A device which allows the front and rear axles to rotate at different speeds in full-time 4WD and AWD systems works to eliminate driveline windup.
Answer the following statement true (T) or false (F)