While concrete is being placed, the forms must be checked to be sure they are _____.
a. not leaking
b. completely filled
c. properly braced
d. plumb and level
d. plumb and level
You might also like to view...
In a(n) ____________________ plan test strategy, each potential participant individually details the performance of each task, though stopping short of the actual physical task required.
Fill in the blank(s) with the appropriate word(s).
A short circuit is a conducting connection between _____.
a. ungrounded conductors b. ungrounded connectors and non-current carrying conductors c. grounded connectors and non-current carrying conductors d. any of the conductors of an electrical system
____ links CADD/CAM, electronics, fluidics, and robotics to create automated factories.
A. Computer-Integrated Machining B. Computer-Integrated Supply C. Computer-Integrated Manufacturing D. Computer-Integrated Automation
Explain why vague terms should not be used in specifications
What will be an ideal response?