Most contracts specify that the owner can take a period of ____ to process progress payment after receipt of the certified application, but this may vary depending on specific factors relating to the owner and project financing.
A. 7 days
B. 14 days
C. 20 days
D. 30 days
Answer: D
You might also like to view...
The accompanying figure shows a(n) ____________________ diagram of a basic START–STOP push button control circuit.
Fill in the blank(s) with the appropriate word(s).
The stirrups in a reinforced concrete beam are used to
A) increase the strength of the beam in shear. B) reduce the deflection of the beam. C) increase the durability of the beam. D) increase the strength of the beam in bending. E) none of the above.
An interest rate of 2% per month is the same as:
(a) 24% per year, compounded monthly (b) a nominal 24% per year, compounded monthly (c) an effective 24% per year, compounded monthly (d) Both (a) and (b)
Three resistors are connected in series across a 60 V source. If VR1 = 19 V and VR2 = 14.3 V, then what is the voltage drop across R3?
A) 26.7 V B) 45.7 V C) 14.3 V D) 19 V