If the fixed cost to produce an item is $500, labor is $2.00 per unit and materials are $2.50 per unit, then the unit cost for an order of 1,000 would be:
A) $5,000. B) $504.50. C) $6.50. D) $5.00.
D
You might also like to view...
Technician A says the DFI fuel injector runs at lower fuel pressures than port fuel injectors. Technician B says that the DFI fuel injector may be difficult to remove from the cylinder head. Who is correct?
A. Technician A B. Technician B C. Both A and B D. Neither A nor B
In the ____ stage of design, the design engineer must address questions and answers from the customer's/client's perspective and from the engineer's perspective.
A. concept generation B. problem identification C. concept selection and refinement D. physical prototyping
As concrete hardens, the heat of hydration continues, decreasing over a period of up to _____.
a. 18 hours b. 36 hours c. several days d. two weeks
Technician A says that the recommended method of tire rotation is front to rear. Technician B says that the recommended method of tire rotation is the modified X method. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians D) Neither technician