The National Electrical Code® requires that all switching be done in the __________ circuit conductor.
a. grounded
b. grounding
c. switch loop
d. ungrounded
d. ungrounded
You might also like to view...
Define: (i) concrete and (ii) concrete admixture.
What will be an ideal response?
Answer the following statements true (T) or false (F)
1. BIM is the most recently developed project delivery method. 2. In a building code, some life safety provisions are contained in fire safety provisions and the remaining ones in structural safety provisions. 3. The board of appeals of the city does not have the authority to change building code provisions. 4. A prescriptive building code provision is easier to enforce than a performance provision. 5. Performance -type building code provisions inhibit the use of innovative building materials and construction systems compared with prescriptive type provisions.
Durante el proceso de secado, el concreto puede contraerse _____ pies lineales.
a. 3/4 pulgada por cada 100 b. 3/4 pulgada por cada 1,000 c. 3 a 4 pulgadas por cada 100 d. 3 a 4 pulgadas por cada 1,000
What is the oldest and most used method of teaching?