When testing and sampling materials for a project, the owner/engineer's resident project representative or inspector should do which of the following:

A. Work from the quality assurance requirements of the specifications only, and wait until you get to the appropriate parts of the specifications before determining the sampling and testing requirements needed.
B. Disregard the test results as long as the job looks good.
C. Develop a sampling and testing plan in advance and work directly from it.
D. Conduct sampling and testing based solely upon practical experience and judgment as the work progresses.


C

Trades & Technology

You might also like to view...

A wind turbine generates 1,493.905 kW-hr during 3.5 hours of operation.  What does the ?turbine generate each hour?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Technician A says normal voltages on the LIN bus is up to 12 volts, which is pulled low during communications. Technician B says in the LIN bus, if a slave module is disconnected from the master module and the ignition switch is in the RUN position, the reading will be about 9.5 volts. Who is correct?

A. Technician A only B. Technician B only C. Both Technician A and B D. Neither Technician A nor B

Trades & Technology

By the 2000s, the traditional nuclear family unit was undergoing severe strain because

A. the divorce rate had increased. B. the number of single-parent households had risen. C. parent-substitutes had assumed the role of child-rearing. D. the family no longer served many of its traditional social functions. E. the family no longer served many of its traditional social functions.

Trades & Technology

The Byzantine Empire lost territory in southern Italy to the

a. Seljuk Turks. b. Ismaili Shi’a Muslims. c. Lombards. d. Normans.

Trades & Technology