The order in which the major divisions involved in a construction project are to perform their work is indicated in the _____.

a. final portion of the takeoff master sheet
b. non-technical section of the specifications
c. submittal document's summary page
d. technical aspects section of the specifications


d. technical aspects section of the specifications

Trades & Technology

You might also like to view...

The visual ____________________ system displays the plant or process status by lighting individual windows identifying process functions.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

What must a sewage system accomplish in order to be considered safe?

What will be an ideal response?

Trades & Technology

A good way to prevent food-borne illness is to _____

a. monitor expiration dates on packages c. store food properly b. cook meat thoroughly d. all of the above

Trades & Technology

One of two basic types of drawings cutting through an entire building or structure, ____ cut across the entire length of a building and may be represented as actual scaled drawings or as symbolic, single-line drawings.

A. longitudinal sections B. cross sections C. lengthwise sections D. lateral sections

Trades & Technology