The order in which the major divisions involved in a construction project are to perform their work is indicated in the _____.
a. final portion of the takeoff master sheet
b. non-technical section of the specifications
c. submittal document's summary page
d. technical aspects section of the specifications
d. technical aspects section of the specifications
You might also like to view...
The visual ____________________ system displays the plant or process status by lighting individual windows identifying process functions.
Fill in the blank(s) with the appropriate word(s).
What must a sewage system accomplish in order to be considered safe?
What will be an ideal response?A good way to prevent food-borne illness is to _____
a. monitor expiration dates on packages c. store food properly b. cook meat thoroughly d. all of the above
One of two basic types of drawings cutting through an entire building or structure, ____ cut across the entire length of a building and may be represented as actual scaled drawings or as symbolic, single-line drawings.
A. longitudinal sections B. cross sections C. lengthwise sections D. lateral sections