What is the primary objective in setting up a project cost control system?
What will be an ideal response?
The primary objective in setting up a project cost control system involves the correlation of the cost control activities from the estimate with reportable construction activities. The cost control activity should be related to a crew assignment so that reporting labor hours can easily be tracked. The activity should not be so small that reporting hours becomes difficult for the foreman. The items should be narrow enough to identify a problem, facilitating a solution. Cost control activities will be used as historical data in estimating future projects and can be applied to several projects, not just one. Obviously, the formation of these activities is very subjective.
You might also like to view...
The ____________________ is the most common portal of entry into the body for pesticides and other chemicals
Fill in the blank(s) with correct word
The three-way heat reclaim valves in most heat reclaim systems are ____ operated.
A. relay B. contact C. switch D. solenoid
Synthesis and testing of each piece of the project building blocks:
A) is unnecessary because most subsystems have already been built and tested. B) is necessary for important subsystems but can be avoided for small, easily developed subsystems. C) is necessary at all system levels. D) would require too much time reproving known technology.
To run a 3-wire cable, a hole is drilled through a plate, the subflooring, and the finished flooring. The plate is 1.6 centimeters, and the subfloor is 3.4 centimeters and the finished flooring is 8 millimeters. Find the depth of the hole in centimeters. Carry the answer to one decimal place.
Fill in the blank(s) with the appropriate word(s).