A posttensioned (PT) concrete slab-on-ground foundation generally consists of
A) a PT slab only.
B) a PT slab, perimeter beams, and intermediate beams.
C) a PT slab and perimeter beams.
D) any one of the above, depending on the superimposed loads.
E) none of the above.
B) a PT slab, perimeter beams, and intermediate beams.
You might also like to view...
What are ten safety precautions you should take while working around electric current?
What will be an ideal response?
Smut can overwinter in soil, plant debris, and seed
Indicate whether the statement is true or false
Evaluate: [ (-1) × (-2) × (4)× (5)× (3)] (-1).
Fill in the blank(s) with the appropriate word(s).
What is the possible cause for a dash message "No RPM message"?
A. Engine RPM's are less than 600 B. Engine RPM's are less than 500 C. Engine RPM's are less than 400 D. Engine RPM's are less than 300