Explain why the live load on the slab-on-ground in a concrete tilt-up wall building is generally higher during the construction of the building than in-service live load.

What will be an ideal response?What will be an ideal response?


See the Instructor's Manual (IM).

Trades & Technology

You might also like to view...

Site grading is necessary to ensure that water drains away from the building properly and does not puddle or run into the building.

Answer the following statement true (T) or false (F)

Trades & Technology

Aluminum is used in the construction of all of the following modern production engine components except:

A. Engine blocks B. Connecting rods C. Pistons D. Intake manifolds

Trades & Technology

Technician A says that the thermostat is most often placed in the engine coolant outlet. Technician B says that the thermostat is most often located on the bottom of the engine. Which technician is correct?

A) Technician A only B) Technician B only C) Both Technicians A and B D) Neither Technician A nor B

Trades & Technology

What instrument is used for measuring leakage rates in a building?

A) A blower door B) Either a blower door or a duct blaster C) A duct blaster D) Leakage rates cannot be directly measured.

Trades & Technology