Solve the linear programming problem by the simplex method





a. x = 24, y = 0, z = 24, t = 0, u = 11, v = 21, w = 32, P = 134

b. x = 0, y = 24, z = 0, t = 0, u = 11, v = 21, w = 32, P = 168

c. x = 11, y = 24, z = 0, t = 0, u = 0, v = 21, w = 32, P = 179

d. x = 11, y = 0, z = 0, t = 24, u = 11, v = 21, w = 32, P = 96


b. x = 0, y = 24, z = 0, t = 0, u = 11, v = 21, w = 32, P = 168

Mathematics

You might also like to view...

Determine the number that will complete the square to solve the given equation after the constant term has been written on the right side. Do not actually solve.4x2 + x + 5 = 0

A. 64
B.
C.
D.

Mathematics

Graph the inequality.x < 2 or x < 7

A.
B.
C.
D.

Mathematics

Solve the problem.An election involving 6 candidates and 20 voters is held, and the results of the election are to be determined using the Borda count method. Assuming there isn't a six-way tie, the minimum number of points a winning candidate can receive is

A. 81 points. B. 71 points. C. 91 points. D. 61 points. E. none of these

Mathematics

Solve the problem. Round to the nearest tenth if necessary.All 32 of the students in a mathematics class attended class on Monday. On Tuesday only 26 students attended. What was the percent of decrease?

A. 23.1% B. 81.2% C. 76.9% D. 18.8%

Mathematics