In most cases, ceiling joists meet over load-bearing interior walls because of span requirements in the IRC. Using the most common layout method, ceiling joists lap over the bearing partition. The two sidewall layouts for ceiling joists are staggered ________ inches so they meet side-by-side over the support

A) 1 1/2" B) 3/4" C) 3" D) 4 1/2"


A