The types of bonds traditionally required on public works contracts are which of the following:

A. Performance Bond & Payment Bond
B. Stop Notice Release Bond and Performance Bond
C. Bid Bond, Payment Bond, Guarantee Bond
D. Payment Bond, Bid Bond, & Performance Bond
E. Payment Bond, Performance Bond, and Guarantee Bond


D

Trades & Technology

You might also like to view...

A precast concrete curtain (PCC) wall panel is provided with two types of connections with the structural frame of the building. Name the two connection types.

What will be an ideal response?

Trades & Technology

What determines the length of the working chute?

What will be an ideal response?

Trades & Technology

?A molecule of acetylene is made up of ____.

A. ?one acetone atom and one carbon atom B. ?two oxygen atoms and two carbon atoms C. ?one hydrogen atom and one carbon atom D. ?two hydrogen atoms and two carbon atoms

Trades & Technology

The marks (lines) on the head of a bolt indicate __________

A) Size B) Grade C) Tensile strength D) Both B and C

Trades & Technology