The supervisor must plan for closeout from the very first day of the job by insisting _____.

a. on regular attendance of all safety meetings
b. that resources be directed to ensure company policies and revenue targets are met
c. on adherence to drawings and specifications
d. that crew members perform to the best of their abilities


c. on adherence to drawings and specifications

Trades & Technology

You might also like to view...

What does PCA stand for?

What will be an ideal response?

Trades & Technology

To decrease carbide precipitation in stainless steel welds, the carbon content of the electrodes should remain

below _____. a. 0.02 percent b. 0.03 percent c. 3 percent d. 2 percent

Trades & Technology

The pointer on a dial-type thermometer is moved by a:

A) Volatile fluid. B) Bimetal element. C) Heat motor and gears. D) Lever that is moved by a column of mercury.

Trades & Technology

A fixture designed only to receive and remove urine is a

A. water closet B. bidet C. urinal D. lavatory

Trades & Technology