The amount of prime coat that is applied prior to HMA paving should be limited to the amount that _____.


a. adequately covers the subgrade soil
b. fills the joints to the upper ring
c. can be absorbed by the base in 24 hours
d. will evaporate in a 12-hour period


c. can be absorbed by the base in 24 hours

Trades & Technology

You might also like to view...

Of all of the techniques for ocean thermal energy conversion (OTEC), the one that has the added advantage of also generating fresh water from sea water is the closed cycle OTEC System

Indicate whether the statement is true or false.

Trades & Technology

If the transmission is being operated in temperatures above 10*F the proper viscosity of gear oil to be used is:

a. 10W30 b. #50 c. #10 d. 75W

Trades & Technology

When installing baseboard molding around the perimeter of a room, outside-corner joints should be _____

a. butt joints b. coped joints c. mitered joints d. scarf joints

Trades & Technology

A two-trip DTC will be stored in the PCM memory when a fault is detected during a subsequent second trip, and the MIL will begin flashing.

Answer the following statement true (T) or false (F)

Trades & Technology