On sloping building sites, it is necessary to change the depth of the footings to accommodate the slope.
Answer the following statement true (T) or false (F)
True
Trades & Technology
You might also like to view...
In a traditional project, the _____ team may involve the owners, the architect, and the general contractor
a. high-level b. mid-level c. corporate d. low-level
Trades & Technology
Explain why contour farming and terracing usually go together
What will be an ideal response?
Trades & Technology
If the cross-sectional area in a circular mils of a wire is 4.107, what is the diameter in mils? Carry the answer to two decimal places.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology
In the circuit in the accompanying figure, the input of a block is provided by ____.
a. an internal device
b. ground
c. the output of the block preceding it
d. the input of the block preceding it
Trades & Technology