The test boring method is commonly used to obtain soil samples from various depths below the ground. The samples are transported to a geotechnical laboratory, where they are tested for various engineering properties of soil. In addition to obtaining soil samples for laboratory testing, the technician must record several pieces of information during the boring process. Name at least two of them.
What will be an ideal response?
Water table elevation. Number of blows required for the soil sampling tube penetration.
You might also like to view...
? Identify and state the historical significance ofDr. Oliver Wendell Holmes, Sr.
What will be an ideal response?
The travel of a piping offset that has a run of 15 inches and an angle of 45 degrees is _____ inches. (Refer to the figure above.)
a. 19.4 b. 21.2 c. 23 d. 25.7
Where are the bypass ports located in a mechanical slide carburetor and what is their function?
What will be an ideal response?
____________________ applications provide power from a fixed site having the necessary input and output channels, as well as the equipment required to fully operate and maintain the systems.
Fill in the blank(s) with the appropriate word(s).