The project schedule is a manifestation of the ____________________-a written or graphical depiction.

Fill in the blank(s) with the appropriate word(s).


project plan

Trades & Technology

You might also like to view...

A pH value of 12 or higher should be considered _____.

a. extremely acidic b. mildly acidic c. extremely alkaline d. mildly alkaline

Trades & Technology

To find the volume of a right triangular prism multiply base × width × height, then _____.

a. divide by 1.5 b. multiply by 2 c. divide by 2 d. multiply by 3

Trades & Technology

The difference between an SCR and a diode is that an SCR _____.

a. has three terminals b. is bidirectional c. has a drain connected to the negative terminal d. is normally open

Trades & Technology

Abandoned Class 2, Class 3, audio or communication cable are ________.

A. Usually reclassified as Class 1 cables B. Any cable not connected at one end and tagged for future use C. Permitted to remain in a building or structure D. Not a fire hazard

Trades & Technology