After permission to survey a building has been obtained, a firefighter should first inspect the:
A. roof
B. basement
C. interior
D. exterior.
Ans: D. exterior.
Trades & Technology
You might also like to view...
Which type of cable is color coded for easy conductor size identification?
A. USE cable B. NM cable C. MC cable D. AC cable
Trades & Technology
Explain the efficiency of a PV module when the cells warm up to above the standard operating temperature of 25°C (77°F).
What will be an ideal response?
Trades & Technology
What should be the length of each diagonal measurement of a square column whose base dimensions are 20 5/8" x 20 5/8"? Round the answer to the nearest hundredth inch.
What will be an ideal response?
Trades & Technology
The float switch contacts may be either normally open or normally closed and ____.
a. may not be submerged b. may not be suspended c. may be submerged d. may be suspended