Solve the problem.The phone company needs to install a line from point A on shore to an island that is 4 miles away from point B, as shown in the drawing below. The cost associated with installing underwater cable is $18,600 per mile, while the cost associated with installing cable over land is $9000 per mile. For the project to be completed at minimum cost, how much of the cable should be installed over land? In other words, at what distance from point A should the company stop laying cable over land? Round your answer to the nearest tenth of a mile, if necessary.4 miles
? 10 miles
A. 6.8 miles
B. 8.8 miles
C. 9.8 miles
D. 7.8 miles
Answer: D
Mathematics
You might also like to view...
Evaluate.C(7, 1)
A. 7
B. 1
C. 7!
D.
Mathematics
Identify the polynomial as a monomial, binomial, trinomial, or none of these. 12x2
A. Trinomial B. None of these C. Monomial D. Binomial
Mathematics
Find the exact value of the expression. Do not use a calculator.cos 60° + tan 60°
A.
B. 2
C.
D.
Mathematics
Use the graph of y = ax2 + bx + c to solve the quadratic equation or inequality.ax2 + bx + c < 0
A. -3 < x < 1 B. -3 ? x ? 1 C. 1 < x < 3 D. x < -3 or x > 1
Mathematics