The pipe schedule number indicates its ____.

A. weight per lineal foot
B. outside diameter
C. inside diameter
D. wall thickness


Answer: D

Trades & Technology

You might also like to view...

With the help of a sketch and notes, explain what a closure strip is with respect to a tilt-up wall building.

What will be an ideal response?

Trades & Technology

Landscaping cloth is used solely to keep insects away from plants

Indicate whether the statement is true or false.

Trades & Technology

Uneven wear across the brake shoe can indicate a bent __________ __________ or a problem with the drum.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

When should the building be used to anchor the butt during a ladder raise?

a. when a single firefighter raises an extension ladder b. for any single-fire-fighter ladder raise c. when sending a roof ladder aloft d. when laddering a building without eaves

Trades & Technology