Write the prime factorization of the number.243
A. 53
B. 35
C. 3 ? 5
D. Prime
Answer: B
You might also like to view...
Complete.14 yd = ft
A. 168 B. 504 C. 126 D. 42
Express the number in scientific notation.0.0000004
A. 4 × 10-6 B. 4 × 10-8 C. 4 × 10-7 D. 4 × 10-9
Set up the linear programming problem.Eric's Carpentry manufactures two types of bookshelves that are 4 feet tall and 3 feet wide, a basic model and a deluxe model. Each basic bookshelf requires 1.5 hours for assembly and 1 hour for finishing; each deluxe model requires 2.5 hours for assembly and 1 hour for finishing. Two assemblers and one finisher are employed by the company, and each works 40 hours per week.(a) Using x to denote the number of basic bookcases and y to denote the number of deluxe bookcases, write a system of linear inequalities that describes the possible number of each model of bookcase that can be manufactured in a week.(b) Graph the system and label the corner points.
What will be an ideal response?
Use the given conditions to find an equation in slope-intercept form of each of the nonvertical lines. Write vertical lines in the form x = h.A vertical line through (-4.37, -6.03)
A. y = -6.03 B. x = -6.03 C. x = -4.37 D. y = -4.37