A mortar-capturing device in a brick veneer assembly is used
A) at each alternate floor level.
B) at each floor level.
C) 2 in. above a flashing.
D) immediately above a flashing.
E) immediately below a flashing.
D) immediately above a flashing.
You might also like to view...
Where steel columns, masonry piers, and wooden posts are used in the construction, a special ____ pad is indicated on the foundation plan.
A. metal B. concrete C. ceramic D. wooden
What are the weather conditions associated with radiation frost?
What will be an ideal response?
Soot forming in the heat exchanger can be caused by:
A) Excessively high combustion temperatures. B) The presence of coal tar in the gas. C) Too much air in the gas—air mixture. D) Too much gas in the gas—air mixture.
The output from an RL differentiator is taken across the ________
A) resistor and inductor B) inductor C) resistor D) source